Sidewalk Improvements

Project No. 2015-822 Sidewalk FY 2016:  Status Currently under construction

Designed by: Wilson & Co.

Contractor: KAAZ Construction contract awarded April 26, 2016

Anticipated Project Completion: September 2016

The  project sidewalks are about 98% completed in the following locations:

  •  4th Street  from VA Entrance to Idaho St.
  • 10th Ave. from Spruce to Miami St. (completed)
  • 20th Street from Eisenhower Rd to Spruce St. (completed)
  • Hughes Road from the EMS Entrance (north of Eisenhower Rd) to the Assisted Living Center (completed)
  • Spruce Street from Grand Ave. to Central St. (completed)

2015-822a: 2nd Street from Elm to Poplar was awarded to  Baker Construction on August 9, 2016 by the Commission.  Late August weather permitting the new sidewalk and curb will be constructed with new ADA ramps on Linn to Elm.

 

These recommendations are also based on citizen contact, USD 453 input on school walking patterns, coordination with other infrastructure projects, direction from the City Commission and committee discussions including rating and inspection.  The intent is to ensure consideration of at least the following categories:

  •         New sidewalk construction
  •         Sidewalk repair
  •         Support for KLINK projects
  •         ADA ramp installations
  •         Sidewalk Cost Share program

 

 The goal is  to have sidewalks improvements completed during the USD453 summer break while children are not walking to school.